Work on the US 190 bridge over Lake Livingston between Onalaska and Oakhurst began Monday.
Traffic pattern changes will occur while work to repaint, repair concrete and guard rail, and overlay the bridge deck with epoxy is performed. Temporary traffic signals will be used to control traffic on the bridge.
According to a press release from the Texas Department of Transportation (TxDOT), the work will not affect access to the Patrick’s Ferry boat ramp.
Wilmington, North Carolina-based contractor Cekra, Inc. is performing the work.
Drivers should plan for possible traffic delays. Use caution when approaching or traveling through the work zone.
Other TxDOT construction and maintenance projects underway in Polk County include:
Crews will prepare FM 1988 for seal coating. They’ll work on road patching, sign maintenance, and will apply herbicide as well.